How to Add Halfday Shift
1. Go to TIME - SHIFT TABLE - then Select Halfday

2. Setup all the fields

3. Then click SAVE.
4. To verify, click the classification to see added schedule
1. Go to TIME - SHIFT TABLE - then Select Halfday

2. Setup all the fields

3. Then click SAVE.
4. To verify, click the classification to see added schedule